2024 Heavy Commercial
Winner
Project Statistics
Location: Philipsburg, Sint Maarten
Type: Resort hotel
Size: 77,955 sq. ft.
ICF Use: 85,400 sq. ft.
Cost: $20 million
Total Construction: 80 weeks
ICF Installation Time: 120 days
Construction Team
Owner/Developer: Divi Resorts
General Contractor: Gemini Contractors
ICF Installer: Gemini Contractors
Form Distributor: Nudura/Tremco CPG
Architect: IXI Design N.V.
ICF Consultant: Tim Viau
ICF System: Nudura
Fast Facts
- Addition to existing Divi Little Bay Resort
- Three 4-story buildings, 98 rooms
- Concrete composite floors and roof
- 77,955 sq. ft. of roof area
- Designed for seismic and hurricane wind loads
- Dryvit TAFS applied over ICF for exterior finish