2024 Unlimited Residential
1st Runner Up

Project Statistics


Location: Orange Beach, Alabama
Type: Residence
Size: 12,776 sq. ft.
ICF Use: 13,891 sq. ft.
Cost: $6 million+
Total Construction: 78 weeks
ICF Installation Time: 45 days

Construction Team


General Contractor: Loper Construction
ICF Installer: Force 5 Walls
Architect: McCollough Architecture
Other Team Member: Justice Olson
ICF System: Fox Blocks

Fast Facts


  • Saltwater pool with a spa and swim-up bar
  • Gym, outdoor shower and cold plunge spa
  • Entryway with floating bridge and koi pond
  • Sauna and limestone-enclosed aromatherapy steam shower
  • Private pet room and courtyard
  • Separate private guest suite above garage

0 Comments

Submit a Comment

Your email address will not be published. Required fields are marked *

Like what you read?

Yearly Subscriptions Starting @ $30