2018 Light Commercial
Best in Class

Project Statistics


Location: Tampa, Florida
Type: Manufacturing and Packaging Facility
Size: 15,600 sq. ft. (floor)
ICF Use: 10,600 sq. ft.
Cost: $3 million
Total Construction: 52 weeks
ICF Installation Time: 45 days

 

Construction Team


Owner: Ostra Holdings
General Contractor: ARCO/Murray Construction
ICF Installer + Form Distributor: Turning Leaf Construction
Architect: Florida Design Studio
ICF System: Fox Blocks

Fast Facts


Design fits perfectly in historic Ybor City area
105 pairs of functional steel window shutters
Specialized HVAC makes entire building a giant humidor

 

 