2011 Unlimited Residential
1st Runner up
The Mothership
Project Statistics
Location: Dewey Beach, Delaware
Type: Private Residence-Custom Home
Size: 7,200 sq. ft. (floor)
ICF Use: 5,200 sq. ft. (all exterior walls)
Cost: 1.8 million
Total Construction: 382 days
ICF installation time: 95 days
Construction Team
Owner: Dave Eppes
General Contractor/ICF Installer: Turnstone Builders, LLC
ICF System: Quad-Lock
Fast Facts
- "Hurricane-proof" construction with concrete roof
- ICF deck tops out 40 feet above grade
- Angled walls; unstacked walls supported with steel beams and columns
- 40% reduction in cooling needs
- Featured in concrete construction magazine
- Generated significant interest in local building and real-estate communities
|