2011 Large Residential
2nd RUNNER UP
Hurry Back Home
Project Statistics
Location: Portage, Wisc.
Type: Private Residence—Custom Home
Size: 4,000 sq. ft.
ICF Use: 5,000 sq. ft. (all exterior walls) plus 4,500 sq. ft ICF floor decking
Cost: $600,000
Total Construction: 430 days
ICF Installation time: 120 days
Construction Team
Owner: David Dumbleton
General Contractor/ICF Installer: Midwest Modern, LLC
Form Distributor: Midwest Construction Materials
Architect: Kyle Dumbleton, AIA
Engineer: Iverson Engineering
ICF System: Walls by Quad-Lock / Floors by Quad-Deck
Fast Facts
- Prairie-style home with cantilevered low-slope roofline
- Geothermal heating and cooling, in-floor radiant heat
- Owners save 70% on heating and cooling bills
- Designed for future green roof installation
- Remote, rugged jobsite perched atop 60-foot ravine
- ICF install crew consisted of owners and extended family
- Wall heights to 32 feet, often with no intervening floors
- Showcased in local press and received design award from local AIA chapter
|