2009 MultiFamily
1ST Runner Up
Carleton College Residence Halls
Project Statistics
Location: Northfield, Minn.
Type: MultiFamily—Two Student Residence Halls
Size: 91,536 sq. ft. (floor) 52,150 + 39,376
ICF Use: 63,840 sq. ft. (walls)
Height: 4 stories plus gables
Cost: $26 million (budgeted)
Project Timeline:
Total Construction: 300 days
Construction Team
Owner: Pegasus Group/Carleton College
Architect: LHB
General Contractor: J.E. Dunn Construction
ICF Installer: Northland Concrete and Masonry
ICF Distributor: Cemstone
ICF System: iForm by Reward
Fast Facts
- Needed to match existing campus architecture
- LEED-Gold certification
- In-floor radiant heat eliminated HVAC system
- Concrete pour at -20 degrees (Core stayed at 100)
- ICFs expedited accelerated construction schedule
- Each lobby hosts an interactive display showcasing ICFs
- College held community open house, in which ICFs were explained
|