2008 Unlimited Residential
2nd Runner up
Ashok Chadha residence
Project Statistics
Location: Frontenac, Ontario
Type: Private Residence
Size: 8,290 sq. ft. (floor)
ICF Use: 5,500 sq. ft. (walls) plus EPS deckng
Cost: $241 per sq. ft.
Project Timeline
Total Construction: Approx. 18 months (June ‘06 to Jan ‘08)
Construction Team
Owner: Ashok Chadha
Architect: Fillmore Design Group
General Contractor: Teixeira Construction/John Teixeira
ICF Installer: Hutchings+Matthews/Dan Hutchings
ICF Distributor: ICS Kingston/ Juan Andres
ICF System: IntegraSpec ICF/Floors by Hambro/ Underslab insulation by Legalett/Blockouts by IntegraBuck
Fast Facts
- 104 corners,
- Multiple wall heights,
- Various 45 degree corners and radius walls
- ICF bridge over breezeway
- Radiant Heat Slab in 32 zones
skylights and high-efficiency wood stove for renewable energy use.
- R-2000 energy award expected.
- Local Cement Assoc. Award
- Used by suppliers in promotional literature
|