Project Statistics
Location: Oklahoma City, Okla.
Type: Multi-Story Residential Condominium
Size: 60,000 sq. ft. (floor)
ICF Use: 90,000 sq. ft (walls) including 25,000 sq. ft of interior walls
Project Timeline
Total Construction: November 2006 to Feb. 2008
ICF Start-to-Finish Time: Unknown
Construction Team
Owner: Triangle Development/Pat Garrett
Architect: TAP Architecture Anthony McDermid
General Contractor: Same as Owner
ICF Installer: Insulating Concrete Homes/Caleb Brown
ICF Distributor: Same as Installer
ICF System: 8” concrete core BuildBlock
Fast Facts
- Two-building project
- Looks like series of dissimilar but complementary townhomes
- Unusual architecture with multiple corners, reveals, bay windows and balconies that could be chosen by the buyer and “clipped on” the massive ICF walls.
- Used hydraulic lift for ICF install
- Chosen as City Show Home and attracted thousands of visitors
- Brought ICFs national attention, including coverage in non-concrete trade magazines.
- Active Geothermal, passive shading and ventilation
- “Green neighborhood strategy” within walking distance of city amenities.
|